EV charger installation, Chatswood.
Tower basements, strata votes, Ausgrid paperwork.
Chatswood, postcode 2067, is Ausgrid territory and its housing is two-thirds apartments, much of it in the towers around the Interchange and The Concourse. EV charger installation Chatswood is therefore mostly a basement-bay, strata-approved job — with the remaining houses handled as straightforward garage installs.
Licensed in Sydney
NSW 382518C
Emergency callouts
Installation from
The Chatswood install rules.
Chatswood sits in the Ausgrid distribution network — a different grid from Western Sydney — and its property mix runs from premium apartment towers in the CBD core to Federation and Tudor homes on the Roseville fringe. The charger is the same. The path to get there differs substantially.

Ausgrid ASP Level 2 — a different network from Western Sydney.
Chatswood is served by Ausgrid, not Endeavour Energy. The two are separate distribution networks with different connection requirements, application processes, and ASP accreditation standards. All four of our sibling suburb pages — Parramatta, Penrith, Blacktown, Liverpool — are in Endeavour Energy territory. Chatswood is not. We hold ASP Level 2 accreditation for the Ausgrid network specifically, which means we can coordinate network connection applications and carry out work at the service line or connection point without referring that scope to a third party. If your install involves a meter upgrade or mains supply increase — more common in older towers or heritage houses with undersized incoming supply — we manage that directly with Ausgrid. You do not need to contact the network separately.
Premium apartment towers — The Bryson, Ethos, Albert Ave, Victoria Ave mid-rise.
Chatswood's high-density residential core is concentrated around Albert Avenue, Victoria Avenue, and the Pacific Highway corridor — buildings that are generally newer, more structurally EV-ready, and more likely to have three-phase supply already in the carpark than older strata stock elsewhere in Sydney. We are familiar with the carpark configurations, basement switchboard access, and body corporate documentation requirements across these buildings. For units in newer towers, the install path is often straightforward: existing three-phase supply, modern switchboard, clean wall mounting, and a sub-metering unit so your consumption is billed to your lot. We quote each building individually — no blanket assumptions about what is already there.
NSW strata rules favour the charger applicant — here is how they work for 2067.
Under NSW strata law a charger request is a sustainability infrastructure resolution: it passes unless more than half the votes cast are against it, a rule in place since 2021. From 1 July 2025 a by-law also cannot ban a charger purely on appearance grounds. We prepare the drawings, load report and metering proposal so the committee can decide.
One team — Ausgrid coordination, installation, and commissioning.
From the Ausgrid connection application through to the certificate of electrical compliance, one team handles every step. The electrician who assesses your switchboard is the electrician who runs the cable and commissions the unit. If the job requires a network application — for three-phase supply or a service line upgrade — we prepare and lodge it directly. There is no handoff to a separate ASP contractor and no back-and-forth between a salesperson and an installer. If the scope changes on the day, we re-quote before continuing. The price you agree at the start is the price on the invoice.
— II. EV in Chatswood
Willoughby LGA and 2067, by the data.
What the public data says about Chatswood homes, cars and charging — and what it means for your install.
Willoughby LGA had at least 3,238 battery-electric vehicles registered in August 2026, close to double the 1,666 of August 2024. Public charging was 27 sites and 72 plugs across the LGA as of December 2025 — at least 45 EVs per plug. What makes Chatswood different is the housing: 68% of dwellings are apartments, households average only 1.1 vehicles, and postcode 2067 has roughly 11 solar systems per 100 dwellings, so solar pairing is rare. EV charger installation Chatswood usually means a metered charger on a basement bay, approved by the owners corporation, with Ausgrid notification handled by us.
Battery EVs registered in Willoughby LGA (minimum)
Sources: ABS Census 2021 QuickStats, Chatswood · Clean Energy Regulator small-scale installations by postcode (to Jul 2026, ÷ ABS dwellings in 2067) · Transport for NSW registration snapshots (battery-electric light vehicles by LGA, Aug 2024–2026; small cells suppressed, so counts are minimums) · TfNSW EV charging locations (Dec 2025).
The EV charger index.
Four services covering the most common Chatswood installation setups — single-phase house installs, strata and apartment builds with sub-metering, three-phase circuits with Ausgrid coordination, and heritage home installs on the Roseville side. Compatible with Tesla Model Y, Model 3, BYD Atto 3, BMW iX, Polestar 2, and premium fleet vehicles.
SRS-EV-017 kW for Chatswood housesFor the 28% of Chatswood dwellings that are separate houses, a 7 kW charger in the garage is the standard install: dedicated circuit, RCD protection, roughly 40–50 km of range per hour, Ausgrid notified.Details
SRS-EV-0222 kW where the tower has three-phaseApartment buildings almost always have three-phase supply in the basement, as do some newer houses. A Wallbox Pulsar or Schneider EVlink at 22 kW adds around 120 km of range per hour; typically from $1,499.Details
SRS-EV-03Solar, where there is a roofPostcode 2067 has roughly 11 solar systems per 100 dwellings — apartment living keeps it low. Houses with panels get a Zappi or Evnex in solar mode; in towers, an off-peak charging schedule does the saving.Details
SRS-EV-04Strata bays in the CBD towersWith 68% of Chatswood dwellings in apartments, we survey the basement, size the run from the common board to your bay, specify metering, and give the committee a sustainability infrastructure resolution pack to vote on.Details
SRS-EV-05Old boards in older housesFederation and inter-war houses on the edges of 2067 can have boards without spare poles or RCD protection. We assess on the site visit and quote a board upgrade or sub-board alongside the charger.Details
SRS-EV-06Offices, retail and fleet parkingWilloughby LGA has at least 3,238 battery EVs and 72 public plugs. Commercial car parks around Westfield Chatswood, Chatswood Chase and office towers can add multi-bay 22 kW charging with load management, quoted per site.DetailsSix charger brands we install.
We supply, install and commission Australia’s most common home and strata chargers — matched to your car, switchboard and solar rather than to a brand deal.






Tesla, Ocular, Zappi and Evnex units shown were installed by SRS on Sydney jobs; Wallbox and Schneider are product images. We install and commission all six — the unit is quoted separately from the $699 installation.
Whether you drive a Tesla, Hyundai, Kia, BMW, or any other EV — SRS installs the right charger for your vehicle, home, and lifestyle.
The numbers behind the promise.
Twenty years of licensed electrical work across Sydney (NSW licence 382518C)
Level 2 ASP accredited — network connection work included
Emergency callouts across Sydney; compliance certificate on every install
Installation from $699 — charger hardware quoted separately
How an install runs in Chatswood
- 01
Basement or garage assessment
Free, about 20 minutes. For an apartment we inspect the common switchboard, the route to your bay and the metering; for a house, the board and cable path.
- 02
Quote plus committee pack
Installation from $699, charger quoted separately. Apartment quotes include the drawings, load calculation and metering proposal your owners corporation needs for the vote.
- 03
Installation after approval
Cable on the approved basement route, RCD-protected circuit, charger mounted at your bay with metering, then load-tested. Houses are usually done in one visit.
- 04
CCEW, Ausgrid, app pairing
You receive the Certificate of Compliance for Electrical Work, we lodge the Ausgrid notification, and we pair the charger app so off-peak scheduling is running before we leave.
Frequently asked.
A standard 7kW single-phase install in a Chatswood house on a modern switchboard typically takes 3–4 hours — site assessment, cabling run, mounting, commissioning, and app pairing. Apartment installs in the CBD towers generally take a similar duration once carpark access and sub-metering are confirmed, though strata documentation can extend the overall lead time before site work begins. Heritage homes on the Roseville fringe, where a switchboard assessment or upgrade is needed, should allow a full half-day. We confirm expected duration when we quote so there are no surprises on the day.
Chatswood is in the Ausgrid distribution network — not Endeavour Energy, which serves Western Sydney. For a standard 7kW single-phase residential install, your licensed electrician manages compliance under their NSW electrical licence — no separate Ausgrid application is required. For 22kW three-phase installs, or where a new or upgraded connection point is involved, a formal Ausgrid connection application must be lodged and approved before the circuit can be energised. We hold Ausgrid ASP Level 2 accreditation and prepare and lodge that application directly as part of the job — you do not need to contact Ausgrid separately. Approval typically takes two to four weeks; we confirm timing at the quote stage.
Yes — and the path is significantly more accessible than it was before mid-2025. Under NSW strata law an EV charger request is a sustainability infrastructure resolution (Strata Schemes Management Act 2015, s132B): it passes unless more than 50% of the votes cast are against it, a lower bar than the special resolution most upgrades need. Since 1 July 2025 a by-law also cannot block a charger on appearance grounds alone. For owners in Chatswood apartment buildings, that change removes the most common barrier. The NSW EV Ready Buildings grant closed to new applications in December 2023, so we quote strata installs without it — the approval path still applies and we prepare the technical documentation your committee needs. We prepare body corporate documentation, handle sub-metering for individual lot billing, and liaise with building management through the approval process. Ask us about the strata process when you enquire and we can give you a clear scope before anything is committed.
Yes. Chatswood houses — particularly on the quieter residential streets toward Roseville and Lindfield — increasingly carry rooftop solar, and pairing a smart charger with that system is an effective way to reduce running costs. The Zappi charger includes an eco mode that monitors your solar export and diverts surplus generation into the car rather than sending it back to the grid at the feed-in tariff rate. Evnex supports similar solar scheduling. We assess your inverter brand and output during the site visit to confirm compatibility. For apartment owners, solar tie-in is not typically available at the lot level, but some Chatswood strata bodies are exploring building-level solar-plus-EV infrastructure. Mention solar interest when you enquire and we will confirm the right configuration.
A standard 7kW residential install from $699 covers: site assessment, RCD, weatherproof enclosure (where applicable), up to 15 metres of cabling from your meter box to the installation point, commissioning, app pairing, and a certificate of electrical compliance. No travel fee within the Chatswood and North Shore area. If your cable run exceeds 15 metres — which can occur in larger blocks or basement carpark installations — additional cabling is quoted before any work starts. Strata and apartment installs include body corporate documentation preparation and sub-metering unit as discussed at quote. Switchboard upgrades for heritage homes are priced separately if the assessment finds one is required, and you approve that cost before we proceed.
The charger unit itself (Tesla Wall Connector, Zappi, Evnex, Ocular, Wallbox or Schneider) is quoted separately so you choose the model; a three-phase 22kW install is typically from $1,499 plus the unit.
For most Chatswood houses and apartments on single-phase supply, a 7kW Level 2 charger — Evnex E2 Plus, Zappi, or Tesla Wall Connector — is the right fit. These charge a typical 60–80 kWh battery from near-empty overnight in 8–12 hours, which suits most commuter households in the area. The Tesla Model Y and Model 3, BYD Atto 3, BMW iX, Polestar 2, Volvo EX90, and premium fleet vehicles all accept a Type 2 connector and work comfortably on a 7kW single-phase circuit. If your EV has a higher onboard charger rating — the BMW iX and some Polestar models support 11kW or more — a 22kW three-phase install is the faster option for compatible vehicles. We confirm the right charger for your car and property setup during the site visit before any work starts.
Postcode 2067 has roughly 11 solar systems per 100 dwellings, against 31 to 35 in Penrith, Blacktown and Liverpool, because 68% of Chatswood dwellings are apartments without their own roof. If you are in one of the 28% of separate houses and have panels, a Zappi or Evnex charger in solar mode uses your export first. In a tower, the saving comes from scheduling charging into off-peak hours.
Not on appearance alone. Since 1 July 2025 a NSW strata by-law cannot ban a charger purely on how it looks. The request itself is a sustainability infrastructure resolution, which passes unless more than half the votes cast are against it. Committees can still ask reasonable questions about load, cable routes and metering, which is why our quote includes the drawings and load report they need.
Eight nearby suburbs, one crew.
Based on the North Shore, we cover Chatswood and the surrounding 2067 corridor — Roseville, Lindfield, Artarmon, Willoughby, and Lane Cove — without a travel premium. Same-week bookings available.
- 01Roseville~2 km
- 02Artarmon~2 km
- 03Willoughby~2 km
- 04Lindfield~3 km
- 05Lane Cove~3 km
- 06Castle Cove~4 km
- 07Northbridge~4 km
- 08Killara~4 km
Also serving nearby: EV charger installation North Sydney · EV charger installation Baulkham Hills · EV charger installation Bella Vista · EV charger installation Castle Hill
Other SRS services in Chatswood: Electrician Chatswood · Security guards Chatswood
Nearby suburbs we cover
Our EV charger installers cover the Lower North Shore, with the same pricing, licences and paperwork in these neighbouring suburbs.
Artarmon
Artarmon has both an industrial estate and apartment streets near the station. For businesses we install 22kW three-phase chargers for fleet and staff parking, with load management on shared supplies. For apartment owners we handle the strata approval paperwork and install a metered charger on your allocated bay.
Roseville
Roseville is mostly federation and inter-war houses on leafy blocks, often with a detached garage or carport down a long driveway. Cable runs can be long, so we size them properly. Switchboards in older homes are checked and upgraded where needed before the charger circuit goes in.
Lane Cove
Lane Cove combines a busy apartment precinct around the village with quieter house streets. Strata installs are common and we take care of the technical side for the committee. Houses here are usually single-phase, so a 7kW charger in the garage or carport is the standard job.
Willoughby
Willoughby is largely freestanding homes, many with the garage at the rear or under the house. We plan the route from the switchboard to where you actually park and keep the finish tidy. A 7kW single-phase unit suits most households, with three-phase an option where supply allows.
Gordon
Gordon has large older homes on big blocks alongside newer apartment buildings along the Pacific Highway. Houses sometimes have detached garages that need a longer run or underground conduit. Apartments go through the strata process. Either way the install is completed by a licensed electrician and covered by a CCEW.
North Sydney
North Sydney is largely apartments and commercial buildings. Most residential installs are in strata basements and start with a capacity check on the common board. Commercial jobs are 22kW three-phase for tenant or fleet parking, often done after hours to suit building management and tenants.
Tell us what you need. Quote in 24h.
Send us your property address, postcode, and what you are driving — and we will come back with a fixed price within 24 hours. Whether it is an apartment bay install in a Chatswood CBD tower, a heritage home on the Roseville fringe, or a three-phase commercial fit-out in the 2067 area, A North Shore electrician reviews every enquiry.
SRS Services · NSW Electrical Licence 382518C · Level 2 ASP
— IX. Related from SRS
Helpful guides before you book.
Three reads that answer the questions Chatswood owners ask us most before an install — written by the electricians who do the work.
Cost guide·16 min readWhat an EV charger install really costs in Sydney (2026)
What a Chatswood basement run costs versus a garage.
Read the guide →
Strata·8 min readNSW strata EV charger rules for apartments
The rules for getting a charger approved in a Chatswood tower.
Read the guide →
Landlords·6 min readEV chargers in NSW rental properties
Half of Chatswood rents: what landlords and tenants can do.
Read the guide →