EV charger installation, Chatswood.
Premium apartments, strata towers, and North Shore houses — Ausgrid-accredited.
NSW-licensed EV charger installation across Chatswood and the North Shore — part of our EV charger installation across Sydney coverage. Fixed price quoted before a cable is run. Whether you are in one of the Chatswood CBD apartment towers or a Federation-era house on the Roseville border, we hold Ausgrid ASP Level 2 accreditation and handle the network coordination, installation, and compliance certificate in a single booking.
The Chatswood install rules.
Chatswood sits in the Ausgrid distribution network — a different grid from Western Sydney — and its property mix runs from premium apartment towers in the CBD core to Federation and Tudor homes on the Roseville fringe. The charger is the same. The path to get there differs substantially.
Ausgrid ASP Level 2 — a different network from Western Sydney.
Chatswood is served by Ausgrid, not Endeavour Energy. The two are separate distribution networks with different connection requirements, application processes, and ASP accreditation standards. All four of our sibling suburb pages — Parramatta, Penrith, Blacktown, Liverpool — are in Endeavour Energy territory. Chatswood is not. We hold ASP Level 2 accreditation for the Ausgrid network specifically, which means we can coordinate network connection applications and carry out work at the service line or connection point without referring that scope to a third party. If your install involves a meter upgrade or mains supply increase — more common in older towers or heritage houses with undersized incoming supply — we manage that directly with Ausgrid. You do not need to contact the network separately.
Premium apartment towers — The Bryson, Ethos, Albert Ave, Victoria Ave mid-rise.
Chatswood's high-density residential core is concentrated around Albert Avenue, Victoria Avenue, and the Pacific Highway corridor — buildings that are generally newer, more structurally EV-ready, and more likely to have three-phase supply already in the carpark than older strata stock elsewhere in Sydney. We are familiar with the carpark configurations, basement switchboard access, and body corporate documentation requirements across these buildings. For units in newer towers, the install path is often straightforward: existing three-phase supply, modern switchboard, clean wall mounting, and a sub-metering unit so your consumption is billed to your lot. We quote each building individually — no blanket assumptions about what is already there.
New NSW strata laws and the $10M apartment grant change the picture for 2067.
From mid-2025, NSW strata law requires only a simple majority — 50% of owners — to approve EV charger installation in common areas, down from the 75% special resolution previously required.
One team — Ausgrid coordination, installation, and commissioning.
From the Ausgrid connection application through to the certificate of electrical compliance, one team handles every step. The electrician who assesses your switchboard is the electrician who runs the cable and commissions the unit. If the job requires a network application — for three-phase supply or a service line upgrade — we prepare and lodge it directly. There is no handoff to a separate ASP contractor and no back-and-forth between a salesperson and an installer. If the scope changes on the day, we re-quote before continuing. The price you agree at the start is the price on the invoice.
The EV charger index.
Four services covering the most common Chatswood installation setups — single-phase house installs, strata and apartment builds with sub-metering, three-phase circuits with Ausgrid coordination, and heritage home installs on the Roseville side. Compatible with Tesla Model Y, Model 3, BYD Atto 3, BMW iX, Polestar 2, and premium fleet vehicles.
Single-phase 7kW install
The standard choice for Chatswood houses and townhouses with existing single-phase supply. We install the Evnex E2 Plus, Zappi, or Tesla Wall Connector — mounted in the garage or on an external wall, weatherproofed, commissioned, and app-paired on the day. Fixed price from $1,499 all-inclusive. Includes up to 15 metres of cabling from your meter box, RCD protection, and a certificate of electrical compliance. Most Chatswood houses built after 2000, and many of the older homes that have had switchboard upgrades, are ready for this install without additional board work. If you are on a block on the Roseville or Lindfield border and your property has not had a switchboard review recently, we assess during the site visit and confirm the scope before starting.
Strata and apartment install — premium towers and mid-rise
The most common service request in the Chatswood 2067 postcode. For apartment owners, the install typically involves basement carpark access, body corporate or strata manager approval, sub-metering so consumption is billed to your lot, and a clean wall-mount in your allocated bay. The NSW Government’s $10M EV-ready apartment grant is available for strata bodies fitting out multiple bays at once — worth raising with your committee before the individual install. Buildings along Albert Avenue, Victoria Avenue, and the Pacific Highway corridor are generally well-suited: newer construction, existing three-phase supply, and modern switchboards. We prepare all documentation, liaise with building management, and confirm the scope during a free phone assessment before site visit.
Three-phase 22kW install
Faster charging for EVs with a higher-rated onboard charger — and the right choice for Chatswood commercial tenancies, premium residential properties with three-phase supply, and strata buildings fitting out multiple bays. Three-phase supply is more commonly available in Chatswood than in Western Sydney suburbs — many apartment buildings and newer houses already have it at the switchboard. Where three-phase supply needs to be connected or extended, we prepare and lodge the Ausgrid connection application directly. Approval typically takes two to four weeks; we confirm expected timing at the quote stage. Compatible with BMW iX, Polestar 2, Tesla Model S Plaid, and commercial fleet vehicles with higher onboard charger ratings.
Heritage home install — Roseville-side Federation and Tudor properties
The residential fringe of the 2067 postcode — particularly the streets running toward Roseville and Lindfield — includes a significant number of Federation-era and inter-war homes with original or partially updated wiring. These properties require careful electrical assessment before EV charger installation: incoming supply capacity, switchboard age, earthing system, and available circuit space all need review before a 32A EV circuit is added. We carry out that assessment during the site visit, quote any switchboard or wiring remediation as part of the same job, and complete the install to current Australian standards. No shortcuts on heritage properties. The result is an install that is code-compliant, insurer-ready, and built to last in a house that may have been standing for 90 years.
Certified installers for leading EV charger brands.
We supply and install Australia’s most trusted EV charger brands — every unit warranted, app-connected, and installed to AS/NZS 3000 standards.
Whether you drive a Tesla, Hyundai, Kia, BMW, or any other EV — SRS installs the right charger for your vehicle, home, and lifestyle.
From the job log.
A sample of recent completed installs across the 2067 postcode and immediate North Shore surrounds.
The numbers behind the promise.
Average dispatch to Chatswood and surrounds
Completed in the 2067 postcode and immediate area
Covering North Shore as a licensed EV installer
Google rating from verified customer reviews
What the locals say.
Frequently asked.
A standard 7kW single-phase install in a Chatswood house on a modern switchboard typically takes 3–4 hours — site assessment, cabling run, mounting, commissioning, and app pairing. Apartment installs in the CBD towers generally take a similar duration once carpark access and sub-metering are confirmed, though strata documentation can extend the overall lead time before site work begins. Heritage homes on the Roseville fringe, where a switchboard assessment or upgrade is needed, should allow a full half-day. We confirm expected duration when we quote so there are no surprises on the day.
Chatswood is in the Ausgrid distribution network — not Endeavour Energy, which serves Western Sydney. For a standard 7kW single-phase residential install, your licensed electrician manages compliance under their NSW electrical licence — no separate Ausgrid application is required. For 22kW three-phase installs, or where a new or upgraded connection point is involved, a formal Ausgrid connection application must be lodged and approved before the circuit can be energised. We hold Ausgrid ASP Level 2 accreditation and prepare and lodge that application directly as part of the job — you do not need to contact Ausgrid separately. Approval typically takes two to four weeks; we confirm timing at the quote stage.
Yes — and the path is significantly more accessible than it was before mid-2025. New NSW strata legislation now requires only a simple majority (50% of owners) to approve EV charger installation in common areas, down from the 75% special resolution previously required. For owners in Chatswood apartment buildings, that change removes the most common barrier. The NSW Government’s $10 million EV-ready apartment grant also provides co-funding for strata bodies upgrading common-area infrastructure — worth raising with your building manager or committee if multiple owners want chargers fitted at once. We prepare body corporate documentation, handle sub-metering for individual lot billing, and liaise with building management through the approval process. Ask us about the strata process when you enquire and we can give you a clear scope before anything is committed.
Yes. Chatswood houses — particularly on the quieter residential streets toward Roseville and Lindfield — increasingly carry rooftop solar, and pairing a smart charger with that system is an effective way to reduce running costs. The Zappi charger includes an eco mode that monitors your solar export and diverts surplus generation into the car rather than sending it back to the grid at the feed-in tariff rate. Evnex supports similar solar scheduling. We assess your inverter brand and output during the site visit to confirm compatibility. For apartment owners, solar tie-in is not typically available at the lot level, but some Chatswood strata bodies are exploring building-level solar-plus-EV infrastructure — the NSW grant is relevant here too. Mention solar interest when you enquire and we will confirm the right configuration.
The fixed-price 7kW install from $1,499 covers: site assessment, charger unit, RCD, weatherproof enclosure (where applicable), up to 15 metres of cabling from your meter box to the installation point, commissioning, app pairing, and a certificate of electrical compliance. No travel fee within the Chatswood and North Shore area. If your cable run exceeds 15 metres — which can occur in larger blocks or basement carpark installations — additional cabling is quoted before any work starts. Strata and apartment installs include body corporate documentation preparation and sub-metering unit as discussed at quote. Switchboard upgrades for heritage homes are priced separately if the assessment finds one is required, and you approve that cost before we proceed.
For most Chatswood houses and apartments on single-phase supply, a 7kW Level 2 charger — Evnex E2 Plus, Zappi, or Tesla Wall Connector — is the right fit. These charge a typical 60–80 kWh battery from near-empty overnight in 8–12 hours, which suits most commuter households in the area. The Tesla Model Y and Model 3, BYD Atto 3, BMW iX, Polestar 2, Volvo EX90, and premium fleet vehicles all accept a Type 2 connector and work comfortably on a 7kW single-phase circuit. If your EV has a higher onboard charger rating — the BMW iX and some Polestar models support 11kW or more — a 22kW three-phase install is the faster option for compatible vehicles. We confirm the right charger for your car and property setup during the site visit before any work starts.
Eight nearby suburbs, one crew.
Based on the North Shore, we cover Chatswood and the surrounding 2067 corridor — Roseville, Lindfield, Artarmon, Willoughby, and Lane Cove — without a travel premium. Same-week bookings available.
- 01Roseville~2 km
- 02Artarmon~2 km
- 03Willoughby~2 km
- 04Lindfield~3 km
- 05Lane Cove~3 km
- 06Castle Cove~4 km
- 07Northbridge~4 km
- 08Killara~4 km
Tell us what you need. Quote in 24h.
Send us your property address, postcode, and what you are driving — and we will come back with a fixed price within 24 hours. Whether it is an apartment bay install in a Chatswood CBD tower, a heritage home on the Roseville fringe, or a three-phase commercial fit-out in the 2067 area, A North Shore electrician reviews every enquiry.