EV charger installation, Baulkham Hills.
Double garages, solar pairing, 22 kW three-phase.
Three in four Baulkham Hills homes are separate houses and roughly 44 in every 100 dwellings in postcode 2153 have rooftop solar, which makes EV charger installation Baulkham Hills mostly garage and solar-paired work. Endeavour Energy network; we lodge the notification.
Licensed in Sydney
NSW 382518C
Emergency callouts
Installation from
The Baulkham Hills install rules.
Baulkham Hills runs two distinct install contexts side by side: Norwest Business Park’s commercial and employer fleet demand, the new Metro-adjacent strata towers filling with professionals, and the established family residential streets behind them. We work across all three without treating any as an afterthought.

Endeavour Energy ASP — Hills District accredited.
Baulkham Hills sits within the Endeavour Energy distribution network. For standard 7kW single-phase residential installs, your licensed electrician manages compliance under their <a href="https://www.nsw.gov.au/business-and-economy/licences-and-credentials/building-and-trade-licences-and-registrations/electrical" target="_blank" rel="noopener">NSW electrical licence</a> — no separate Endeavour Energy application is required. For 22kW three-phase commercial installs at Norwest Business Park premises, we hold Authorised Service Provider accreditation and prepare the connection application directly. Multi-charger commercial sites requiring Endeavour Energy network notification are a regular part of our work in this area — you do not need to coordinate with the distributor separately. We know the metering configurations and approval timelines across the 2153 network.
NORWEST BUSINESS PARK — workplace EV charging for a $3B precinct.
Norwest Business Park is one of Greater Sydney's largest commercial precincts — a major business park with hundreds of companies and a large daily workforce. As the EV fleet grows across that workforce, employer-provided charging has shifted from a perk to a staff retention and sustainability expectation. We install commercial-grade 22kW three-phase chargers and load-managed multi-bay configurations for Norwest employers — handling the full scope from Endeavour Energy connection application through to commissioning and compliance certification. We do not name specific tenants as clients, but we work regularly with businesses across the precinct on fleet and staff EV deployment. If you are a Norwest facilities manager or fleet manager looking at workplace charging, contact us with your site address and we will respond with a commercial scope assessment.
Norwest Metro strata towers — sub-metering and load management.
The Norwest Metro Station precinct is adding significant residential density: Norwest Quarter (577 apartments, mid-2026 move-in), Esplanade Norwest, and Haven Norwest are all near completion or in final sales. These towers create a concentrated pipeline of strata EV charger demand — residents who commute by Metro during the day and want to charge at home overnight. Strata installs in these buildings require owners corporation approval, sub-metering so consumption can be billed to individual lots, and load management to ensure multiple simultaneous chargers do not overload the building's common supply. We handle all of this in a single engagement with the strata committee — including documentation, cabling design, and commissioning. Speak to us before the building settles if you want to establish a charging infrastructure plan rather than retrofitting one lot at a time.
Workplace and fleet charging, quoted after a site visit.
Norwest Business Park employers usually want several bays at once. We design 22kW three-phase multi-bay layouts with load management so the site’s existing supply is used before any network upgrade is considered, handle the Endeavour Energy application if one is needed, and supply the compliance certificates and charger specifications for your records.
— II. EV in Baulkham Hills
A house-and-solar suburb, in numbers.
What the public data says about Baulkham Hills homes, cars and charging — and what it means for your install.
Baulkham Hills is a house suburb: 75% of dwellings are separate houses, households average 1.9 vehicles, and roughly 44 of every 100 dwellings in postcode 2153 have rooftop solar. That shapes EV charger installation Baulkham Hills — a 7 kW single-phase unit in the garage for most homes, a Zappi or Evnex where there is solar to divert, and 22 kW where three-phase supply already exists. The Hills Shire LGA has at least 7,950 battery-electric vehicles registered, up from 3,436 in August 2024, against 50 public plugs — at least 159 EVs per plug. Home charging carries the load.
Battery EVs registered in The Hills Shire LGA (minimum)
Sources: ABS Census 2021 QuickStats, Baulkham Hills · Clean Energy Regulator small-scale installations by postcode (to Jul 2026, ÷ ABS dwellings in 2153) · Transport for NSW registration snapshots (battery-electric light vehicles by LGA, Aug 2024–2026; small cells suppressed, so counts are minimums) · TfNSW EV charging locations (Dec 2025).
The EV charger index.
Four services covering the most common Baulkham Hills installation contexts — single-phase family home installs, Norwest commercial and employer fleet, Norwest Metro strata towers with sub-metering, and established residential. Compatible with Tesla Model Y, Model 3, BYD Atto 3, Kia EV6, Hyundai Ioniq 6, Polestar 2, and BMW iX.
SRS-EV-017 kW in the double garageThree-quarters of Baulkham Hills dwellings are separate houses, often with the switchboard within a short run of the garage. A single-phase 7 kW charger — Tesla Wall Connector, Ocular or Evnex — restores 40–50 km per hour.Details
SRS-EV-0222 kW where three-phase existsLarger Hills homes with ducted air or a pool may have three-phase supply. If yours does, a Wallbox Pulsar Plus or Evnex X-series charges at 22 kW — around 120 km per hour — for two-EV households.Details
SRS-EV-03Solar-paired charging on 2153 roofsPostcode 2153 has roughly 44 solar systems per 100 dwellings. A Zappi or Evnex charger diverts the midday surplus into the car instead of exporting it, so weekday top-ups can run largely on your panels.Details
SRS-EV-04Townhouses and dual-occupancyTownhouses and semis are about 13% of Baulkham Hills dwellings. We confirm which meter the charger runs from, check any shared board, and fit a compact Ocular or Wallbox unit to your garage or carport.Details
SRS-EV-05Board check before the chargerEstablished Baulkham Hills homes often carry boards sized for less load than an EV charger adds. We check safety switches, main switch rating and spare ways at the free visit and quote any upgrade separately.Details
SRS-EV-06Fleet and workplace chargingWith at least 7,950 battery EVs in The Hills Shire LGA and 50 public plugs, workplace and fleet bays are the gap. Load-managed 22 kW installs for offices and depots, quoted after a site visit.DetailsSix charger brands we install.
We supply, install and commission Australia’s most common home and strata chargers — matched to your car, switchboard and solar rather than to a brand deal.






Tesla, Ocular, Zappi and Evnex units shown were installed by SRS on Sydney jobs; Wallbox and Schneider are product images. We install and commission all six — the unit is quoted separately from the $699 installation.
Whether you drive a Tesla, Hyundai, Kia, BMW, or any other EV — SRS installs the right charger for your vehicle, home, and lifestyle.
The numbers behind the promise.
Twenty years of licensed electrical work across Sydney (NSW licence 382518C)
Level 2 ASP accredited — network connection work included
Emergency callouts across Sydney; compliance certificate on every install
Installation from $699 — charger hardware quoted separately
How an install runs in Baulkham Hills
- 01
Free 20-minute site check
We inspect the board, measure the run from meter box to garage, note your solar inverter and confirm single- or three-phase supply. Free, no obligation.
- 02
Fixed quote in writing
One itemised price covering the charger you choose, the cable run, solar pairing and any board work. No callout fee to quote, no surprises on the day.
- 03
Installation in one visit
We run the dedicated circuit, mount the charger in the garage, set up solar diversion if you have panels and test with your car. Usually half a day.
- 04
CCEW, Endeavour notification, app
Certificate of Compliance for Electrical Work issued, the Endeavour Energy EV-charger notification lodged by us, and the app paired with an off-peak or solar schedule set.
Frequently asked.
A standard 7kW single-phase install in a Baulkham Hills family home on a modern switchboard typically takes 3–4 hours — site assessment, cabling run, mounting, commissioning, and app pairing. Commercial installs at Norwest Business Park premises — where load management design, multi-bay cabling, and sub-metering are involved — are scoped and scheduled separately based on the site. Strata installs in Norwest apartment towers are similarly scoped to the building’s layout and the number of lots being serviced. We confirm the expected duration at the quote stage for every job type. No surprises on the day.
Baulkham Hills is in the Endeavour Energy distribution network. For a standard 7kW single-phase install at a residential property, your licensed electrician manages compliance under their NSW electrical licence — no separate Endeavour Energy application is required. For 22kW three-phase commercial installs at Norwest Business Park or multi-charger sites that require a supply upgrade, a connection application must be lodged and approved before the circuit is energised. We hold Authorised Service Provider accreditation and prepare that application directly — you do not need to coordinate with Endeavour Energy separately. Approval timelines for commercial three-phase applications are confirmed at the quote stage.
Yes. For Norwest offices and fleet depots we install 22kW three-phase chargers across multiple bays with load management, lodge the Endeavour Energy application where the supply needs upgrading, and issue a CCEW and compliance documentation on completion. Earlier NSW fleet-charging grant rounds have closed, so we quote workplace installs on their own merits after a site visit.
Yes, though the process is more involved than a freestanding home install. Strata EV charger installation in Norwest towers — including Norwest Quarter and other Metro-adjacent buildings — requires owners corporation approval, sub-metering so each lot is billed for its own consumption, and load management design to ensure simultaneous charging does not overload the building’s common electrical supply. We manage all of this: owners corporation documentation, cabling design, sub-metering installation, and commissioning. For strata committees considering a building-wide rollout rather than piecemeal lot-by-lot installs, we can provide a staged infrastructure plan. Contact us with your building address and we will provide a strata-specific scope. You can also find general guidance on strata EV charger grants at energy.nsw.gov.au.
A standard 7kW residential install from $699 covers: site assessment, RCD, weatherproof enclosure, up to 15 metres of cabling from your meter box, commissioning, app pairing, and a certificate of electrical compliance. No travel fee within the Baulkham Hills area. If the run from your meter box to the installation point exceeds 15 metres, additional cabling is quoted separately before work starts. Switchboard upgrades, if required, are priced separately and approved before we proceed. For commercial installs at Norwest Business Park or strata towers, sub-metering is an additional scope item quoted as part of the commercial assessment — it covers the metering hardware, load management configuration, and per-lot billing wiring. Commercial pricing is provided as a fixed scope after the site assessment, not as an hourly rate.
For established Baulkham Hills family homes on single-phase power, a 7kW Level 2 charger — Evnex E2 Plus, Zappi, or Tesla Wall Connector — is the standard fit. These chargers accept a Type 2 connector and are compatible with the Tesla Model Y, Model 3, BYD Atto 3, Kia EV6, Hyundai Ioniq 6, Polestar 2, and BMW iX — all common in the 2153 demographic. A 7kW single-phase charger fills a typical 60–80 kWh battery from near-empty overnight in 8–12 hours. For Norwest commercial premises with multiple bays or faster fleet turnaround requirements, a 22kW three-phase charger is the right specification. We confirm the correct charger for your property type and vehicle at the site assessment before any work starts — see the full EV charger installation guide for broader brand and specification detail.
Partly. Roughly 44 in every 100 dwellings in postcode 2153 have rooftop solar, and a solar-aware charger like the Zappi or Evnex pushes whatever your panels are exporting into the car during the day. A 7 kW charger adds around 40–50 km of range per hour; on solar alone the rate rises and falls with the sun, so most households pair daytime solar with an off-peak overnight top-up.
Yes — 22 kW AC charging needs three-phase supply, and a Tesla Wall Connector tops out at 11 kW in Australia even on three-phase. For 22 kW we install a Wallbox Pulsar Plus, Schneider EVlink or Evnex X-series. Most suburban houses are single-phase, and with 1.9 vehicles per household a 7 kW unit still covers two cars' daily driving overnight. We confirm your supply at the site check before quoting.
Eight nearby suburbs, one crew.
Based locally in the Hills District, we cover Baulkham Hills and the surrounding suburbs without a travel premium. Same-week bookings are available across Castle Hill, Bella Vista, Norwest, Winston Hills, Northmead, Carlingford, Seven Hills, and Kellyville.
- 01Castle Hill~3 km
- 02Bella Vista~3 km
- 03Norwest~3 km
- 04Winston Hills~3 km
- 05Northmead~5 km
- 06Carlingford~6 km
- 07Seven Hills~6 km
- 08Kellyville~5 km
Also serving nearby: EV charger installation Bella Vista · EV charger installation Castle Hill · EV charger installation Auburn · EV charger installation Blacktown
Other SRS services in Baulkham Hills: Electrician Baulkham Hills · Security guards Baulkham Hills
Nearby suburbs we cover
Our EV charger installers work throughout the Hills District and the neighbouring suburbs toward Parramatta, with the same licences, pricing and CCEW paperwork in each one below.
Castle Hill
Castle Hill has family homes with double garages alongside newer apartment buildings near the Metro and Castle Towers. House installs are usually a 7kW unit with a short run, or 22kW where three-phase supply already exists. Apartment owners go through strata, and we handle the technical documentation the committee needs.
Bella Vista
Bella Vista homes are large, often with a double or triple garage and room for a 22kW charger where three-phase supply is available. Newer apartments near the Metro are strata installs, with a metered charger on your allocated bay after a capacity check on the common switchboard.
Northmead
Northmead mixes older brick homes with townhouse complexes and units. Houses often have a single garage or carport and a switchboard that needs a safety switch added before a charger circuit goes in. In complexes we confirm the metering with strata before fitting a charger to your space.
Winston Hills
Winston Hills is largely 1970s brick homes on established blocks, usually with a garage attached to the house. Switchboards from that era are checked for a safety switch and spare capacity before we quote. A 7kW single-phase charger suits most households here, with cable runs kept short.
North Rocks
North Rocks has family homes on sloping blocks, with garages sometimes below the house or set back from the street. We plan the cable route on a site visit and size it for the distance so the charger keeps full output. Solar is common and can be paired with the charger.
Norwest
Norwest is business park offices plus newer apartments around the Metro station. Commercial installs are typically 22kW three-phase with load management for staff or fleet parking. Apartment installs go through the strata process, and we provide the paperwork the committee needs to approve a charger on your bay.
Tell us what you need. Quote in 24h.
Send us your Baulkham Hills or Norwest address, postcode, and what you are working with — a home install, a commercial Norwest site, or a strata tower — and we will come back with a fixed price within 24 hours. Whether it is a 7kW garage install on an established residential street, a load-managed multi-bay employer fleet setup at Norwest Business Park, or a sub-metered strata rollout for a new Metro-adjacent tower, SRS holds NSW NSW Electrical Licence 382518C and $20 million public liability. A Hills District electrician reviews every enquiry.
SRS Services · NSW Electrical Licence 382518C · Level 2 ASP
— IX. Related from SRS
Helpful guides before you book.
Three reads that answer the questions Baulkham Hills owners ask us most before an install — written by the electricians who do the work.
Cost guide·16 min readWhat an EV charger install really costs in Sydney (2026)
Realistic 2026 install pricing for a Baulkham Hills garage or three-phase job.
Read the guide →
Decision guide·7 min readSingle-phase vs three-phase: which charger do you need?
Single- or three-phase for a two-car Hills household — which to choose.
Read the guide →
Solar·8 min readCharging your EV from rooftop solar
Getting the most from the solar already on your 2153 roof.
Read the guide →